We use cookies to provide a better user experience and personalised service. By consenting to the use of cookies, we can develop an even better service and will be able to provide content that is interesting to you. You are in control of your cookie preferences, and you may change them at any time. Read more about our cookies.

Skip to content

LNG Terminal, Kokkola Energy

When Kokkolan Energiaverkot Oy set out to develop Finland’s first LNG terminal outside the national gas transmission network, Jake was selected as the main contractor. Despite a demanding schedule and a technically challenging project, the terminal was completed on time thanks to strong project management and proactive collaboration.

The project was awarded through a public procurement process with strict legal requirements and detailed selection criteria. Markus Kekolahti, Business Director at Kokkolan Energiaverkot Oy, notes that Jake stood out by offering the right expertise at a competitive price.

The Capability to Deliver Complex Industrial Projects

The LNG terminal at Kokkola Industrial Park is a unique and technically complex industrial facility that stores liquefied natural gas, vaporizes it, and distributes it to nearby industrial companies. As a result, the project placed exceptionally high demands on the foundation work and overall coordination. Jake was appointed as the main contractor with full responsibility for site work, foundations, and underground utility infrastructure for the new gas terminal.

In addition to demanding earthworks and heavy concrete foundations, the project included extensive equipment deliveries, each with its own specific schedule. Jake’s role was to coordinate and synchronize all these moving parts into a fully functioning whole.

“Jake acted as our main contractor and managed the schedule exceptionally well. They handled project supervision with great professionalism and took all stakeholders on site into account,” says Markus Kekolahti.

Transparency Creates Confidence

As the project progressed and a number of changes arose, Jake demonstrated flexibility, agility, and the ability to make quick decisions. Rather than allowing the process to slow down, Jake proactively presented well-considered solutions to the client.

“Jake presented solutions that were easy for us to evaluate and make decisions on. Their professional expertise was evident in the way they knew exactly what was required to bring the project across the finish line,” says Markus Kekolahti.

Another cornerstone of the project’s success was communication. Through regular project meetings, thorough documentation, and close monitoring of completed and outstanding work, Kokkolan Energiaverkot’s management could remain confident that the project was moving in the right direction.

“It was a pleasure to watch the project progress and see tasks being completed. Regular project follow-up and reporting gave management confidence that everything was under control.”

An Industrial Construction Partner Trusted in the Kokkola Region

According to Kekolahti, the successful delivery of the LNG terminal demonstrates Jake’s ability to manage large-scale and complex industrial projects. He does not hesitate to recommend Jake for similar future projects and views the company as a fully capable industrial construction partner.

“Jake has proven what they are capable of here in the Kokkola region. There is a high level of trust in them as an industrial construction partner.”